How to Assemble a Horizontal Tube Balustrade System.

Horizontal Tube Balustrade SystemEZ Rails provides Horizontal Tube Balustrade Systems that are ideal for balconies and stairways in both residential and commercial areas. Our kits include post fixing, base cover and factory attached fittings to the post, ensuring easy assembly.

 

Tools You Need

Drill Machine

drill machine

Drill Bit

drill bit

Post Level

post level

Pair of Pliers

pliers

Spanner

spanner

Marker

marker

Measuring Tape

measuring tape

How To Install

Using measuring tape and a marker, mark where you want to position the corner post, leaving 100mm space from the edges, then mark every 1200mm.

Use a core drill to drill holes where the marked areas are. 

Fill holes with epoxy and then insert the posts into the drilled holes. Once all the posts have been inserted, apply the top rail and fasten all bolts.

Using a post level to make sure that all the posts are straight.

Attach the rest of the horizontal tubes, making sure you tighten all bolts with a spanner.

See http://www.ezrails.co.za/ez-rails-assembly-video-horizontal-tube-balustrades-system

 

 

 

How To Assemble A Horizontal Tube Balustrade System

Our kits include post fixing, base cover and factory attached fittings to the post, ensuring easy assembly, these are the tools you need:

Add new comment